SOLAR PANEL INDUSTRY APPLICATION FOR THIN FILM MODULES MANUFACTURING

AMCEC Inc. has already supplied the design, engineering study, equipment, installation, and start-up of two air pollution control systems for 96 chemical Vapor Deposition chambers 160 MW/year.
This turnkey project includes 4 steps:

  • – Fume oxidation
  • – Fume filtration
  • – Silica compacting
  • – Acid gas neutralization

solar1

Burner and thermal insulated and Halar®coated duct and fan (266°F)

solar2

Insulated filters and Halar®coated duct and fan (266°F) 2 x 33,600 ft2, inlet silica dust: 1,200 lbs./day

Two complete wet scrubbers trains (Quench, spraying and packing units) Flow: 2 x 31,000 scfm-HF outlet

Two complete wet scrubbers trains (Quench, spraying and packing units)
Flow: 2 x 31,000 scfm-HF outlet <6ppmv

solar4

Master VFD’s, MCC’s, and Control Panel